complete scheme estimated to cost $9,575,000, which would enable the largest vessels afloat to unload directly on to the quays and give ample space for the handling and warehousing of very large importations. The Consulting Engineers in a letter of which a copy was enclosed in Your Lordship's Confidential Despatch of the 8th June last, approved generally of the preliminary scheme subject to

nclosure 2.

the modification of carrying the reclamation 200 feet further in a Southerly direction.

3.

On working out the details of the Station Yard in accordance with the preliminary reclamation scheme above referred to the Chief Resident Engineer found that it did not provide sufficient room for the terminal arrangements and after consultation with me submitted on the 1st June last to the Consulting Engineers the larger scheme, shown on the enclosed plan, in which it was proposed to carry the reclamation a further distance of about 1,000 feet until it abutted on Blackhead's Kowloon Marine Lot No. 81. The Consulting Engineers replying on the 5th July to Mr. Eves's submission stated that it proposed a reclamation of considerably greater magnitude than in the preliminary scheme they had already reported on

Edit History

2026-06-03 23:15:57 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
597 CA тавно complete scheme estimated to cost $9,575,000, which would enable the largest vessels afloat to unload directly on to the quays and give ample space for the handling and warehousing of very large importations. The Consulting Engineers in a letter of which a copy was enclosed in Your Lordship's Confidential Despatch of the 8th June last, approved generally of the preliminary scheme subject to nclosure 2. the modification of carrying the reclamation 200 feet further in a Southerly direction. 3. On working out the details of the Station Yard in accordance with the preliminary reclamation scheme above referred to the Chief Resident Engineer found that it did not provide sufficient room for the terminal arrangements and after consultation with me submitted on the 1st June last to the Consulting Engineers the larger scheme, shown on the enclosed plan, in which it was proposed to carry the reclamation a further distance of about 1,000 feet until it abutted on Blackhead's Kowloon Marine Lot No. 81. The Consulting Engineers replying on the 5th July to Mr. Eves's submission stated that it proposed a reclamation of considerably greater magnitude than in the preliminary scheme they had already reported on
Baseline (Original)
597 CA тавно complete scheme estimated to cost $9,575,000, which would enable the largest vessels afloat to unload directly on to the quays and give ample space for the handling and ware- -housing of very large importations. The Consulting Engineers in a letter of which a copy was enclosed in Your Lordship's Confidential Despatch of the 8th. June last, approved generally of the preliminary scheme subject to nclosure 2. the modification of carrying the reclamation 200 feet further in a Southerly direction. 3. On working out the details of the Station Yard in accordance with the preliminary reclama- -tion scheme above referred to the Chief Resident Engineer found that it did not provide sufficient room for the terminal arrangements and after consultation with me sub- -mitted on the 1st. June last to the Consulting Engineers the larger scheme, shown on the enclosed plan, in which it was proposed to carry the reclamation a further distance of about 1,000 feet until it abutted on Blackhead's Kowloon Marine Lot No. 81. The Consulting Engineers reply- -ing on the 5th. July to Mr. Eves's submission stated that it proposed a reclamation of considerably greater magnitude than in the preliminary scheme they had already reported on
2026-06-03 23:15:57 · Baseline
View content

597

CA тавно

complete scheme estimated to cost $9,575,000, which would

enable the largest vessels afloat to unload directly on to

the quays and give ample space for the handling and ware-

-housing of very large importations. The Consulting

Engineers in a letter of which a copy was enclosed in Your

Lordship's Confidential Despatch of the 8th. June last,

approved generally of the preliminary scheme subject to

nclosure 2.

the modification of carrying the reclamation 200 feet

further in a Southerly direction.

3.

On working out the details of the

Station Yard in accordance with the preliminary reclama-

-tion scheme above referred to the Chief Resident Engineer

found that it did not provide sufficient room for the

terminal arrangements and after consultation with me sub-

-mitted on the 1st. June last to the Consulting Engineers

the larger scheme, shown on the enclosed plan, in which it

was proposed to carry the reclamation a further distance

of about 1,000 feet until it abutted on Blackhead's

Kowloon Marine Lot No. 81. The Consulting Engineers reply-

-ing on the 5th. July to Mr. Eves's submission stated that

it proposed a reclamation of considerably greater magnitude

than in the preliminary scheme they had already reported

on